How to Power Cycle the Cisco Meraki Z4C Teleworker (TW) Gateway BTech BTech Alerts & Notifications - Check this page for the latest information on emergencies and system outages. All times are Pacific. Network Support Training, 1000062324. Teleworker (TW) Gateway Information and Pictures, 1000062355. Teleworker (TW) Gateway Overview Power Cycling process helps resolve minor connectivity or performance issues by rebooting the device and refreshing its network settings. Steps to Perform Only perform these steps when instructed. Performing these steps will take the Network Offline. Locate the Cisco Meraki Z4C Teleworker (TW) Gateway. Locate the Power Cable on the back of the Cisco Meraki Z4C Teleworker (TW) Gateway. Disconnect the Power Cable for 30 seconds. Leave the Power Cable disconnected for at least 30 seconds. Connect the Power Cable.The Cisco Meraki Z4C Teleworker (TW) Gateway will take about 5-10 minutes to power on and come online.